Each Contract, sub-contract and / or Tender Specifications is reviewed by;
WA Pecktel engineering to ensure the following:

1.  Requirement of the Customer are established, defined and documented.
2.  Any discrepancies of the requirement are resolved.
3.  Establish  that  WA  Pecktel  Engineering  has  the  capability  to  meet  the
requirements.
4.  Records of such contract reviews are made.
5.  All amendments made by customers are confirmed  in writing and acknowledged  in
writing by WA Pecktel Engineering.

Quality  plans  are  made  to  define  the  points  of  inspection  and  allocate  own  and  /  or
Customer’s resources for the same.